Gallery

Dry Gas Pipe line with PEG/SCOP

EGC has Vast experience in Pipe line works , our qualified engineering staff pledges to execute as per quality standards. Our goal is to fulfill our client needs to build long term partnerships and to deliver projects according to the designs and within schedules , we work in consultation with our clients in order to customize the individual requirements for our respective clients.

Piping works with SEPCOIII

EGC is working for SEPCOIII for piping work, the work includes welding, Blasting and coating of pipes , installation of Heavy Equipment’s along with Excavation for the pipe line. Our International Staff is playing major role in the quality and planning of the project as per standards and requirement of client.

Site Office & Camp Construction as EPCC for SEPCO III

EGC has constructed Site office and Camp living of SEPCO III as a EPCC sub contractor. EGC Striving for the excellence , to achieve high position in Iraq to meet the client requirements.

Electrical Installation Works with SEPCO III

EGC is installing all the electrical items as Technical Specifications, regulations, procedures and client requir ements. EGC has deputed a special team from Sudan for this work who have vast experience is the electrical projects to meet the client needs and standard specifications.

Construction of Block Valve Stations (BVS) for Grand Energy Development

Civil works for concrete valve pit, solar panel foundations, passive cooled shelter, N2 cylinder foundation, and earth works for the BVS platform and fencing.

Construction of Evaporation Ponds in waste disposal Area.

Earth works and embankment to construct 6 evaporation ponds and lining with HDPE liner the pond size is 50x50m.

CPP BASE CAMP

T walls installation, Earth works, Asphalt Roads, Infra structures, Gardens and vegetation.

ANTON OIL WELL PAD F CAMP

Construction of Well pad F Accommodation caravans and infrastructures and providing services for the Camp, like diesel and water supply, waste water removal, Garbage removal.

HBP Camp Extension

Asphalt Roads, Drainage and water supply networks, Dining Room construction and lighting poles.

Heavy Oil Transportation System HOTS2 Civil works

Survey Works, Right Of Way clearance ROW, Excavation works, backfilling and berm construction.

Construction of Block Valve Stations (BVS) for Grand Energy Development

Mechanical work includes in stallation of Block valve structures & Civil works for concrete valve pit, solar panel foundations, passive cooled shelter, N2 cylinder foundation, and earth works for the BVS platform and fencing